What We Achieved

Cronin Group delivered and positioned new server racks in a live data centre environment with zero disruption, 100% health & safety compliance, and sustainable waste management. The result was a smooth install that met the client’s technical, environmental and operational standards.

The Result

  • Zero incidents or delays
  • All racks installed to exact client specification
  • Full compliance with on-site access and RAMS protocols
  • 100% of crating waste recycled
  • Project completed within scheduled window

How We Delivered

  • Toolbox Talk held at Cronin HQ
  • Racks collected from third party warehouse and delivered to data centre
  • Team Leader completed safety walk and approved route
  • SOPs and RAMS submitted to site technician
  • Racks unloaded, de-crated and staged on the loading bay
  • Client loaded batteries, whips and cables
  • Two-man per rack team team transferred racks with hands-on control to final position
  • Waste removed for off-site recycling

Client Testimonial

“Cronin Group executed this install flawlessly. Their attention to health & safety, communication with our on-site team, and environmental responsibility made a big impression. A professional and efficient job from start to finish.”
— Data Centre Operations Manager