Client: Education & Training Board

THE CHALLENGE

A 250kg Victorian etching press — antique and irreplaceable — needed to move from a third-floor room in Dublin 7 to Clonmel, Co. Tipperary. With no lift and only a narrow staircase, it had to be carefully dismantled before it could travel.

THE SOLUTION

  • Dismantled on-site by our experienced crew
  • Hand-carried down the narrow stairwell, piece by piece
  • Secured and loaded onto a Cronin Group air-suspension vehicle
  • Delivered and offloaded carefully in Clonmel
  • Reassembled and positioned, ready for use

One team, one plan, start to finish.

THE RESULT

Cronin Group provided an excellent service from start to finish. The team handled the dismantling, transportation and reassembly of our Victorian etching press with great care and professionalism.” — Operations Manager, Education & Training Board